
Project and Construction Management for the full refurbishment of an asset with asset class change from gym into offices. The project includes the extention of the third floor and raising of one portion of the fourth floor thanks to the translation of gross surface area from the undergroud floor and the deduction of gross surface area from perimetral walls to achieve energy efficiency. It also includes the reconstruction of the full building shell with a glass facade of the office floor and metallic cover of the stairwell.
CATEGORY: Technical Services
SERVICES: Project e Construction Management from the design stage to the delivery of the asset
CLIENT: DeA Capital Real Estate SGR S.p.A. – Omega Immobiliare Fund
LOCATION: Milano, via Oglio 21
GROSS SURFACE AREA: approx. 7.000 smq
ARCHITECTURE: Barreca & La Varra
ENGINEERING: Structures– S.C.E. Project S.r.l.; Plants and LEED – Moving S.r.l.; Fire prevention – GAE Engineering S.r.l.
CLOSING: in progress